Pouring the Rink Floor

On Friday, June 8th, 2007.. The pouring of the concrete on the Rink floor took place. The frist concrete came out of the trucks around 7:30 am and went non-stop until about 1:30 pm. The 6 hour pour used about ~230 yards of concrete in pouring the 5 inch slab. Each concrete truck holds 10 yards, so there was a bit of action at the pump truck. ** Pics Added 6-17-07 **
http://assets.ngin.com/attachments/photo/0002/8260/06-07-07_Wrapping_Removed_thumb.jpg
  • 06-08-07 Wrapping Removed, Staging Starting to be Removed
  • 06-08-07 Concrete pump truck
  • 06-08-07 Boom stuck into the rink
  • 06-08-07 Concrete into the Pump Truck
  • 06-08-07 Power Screed..Levels the floor by Lasers
  • 06-08-07 Power Trowels to smooth the floor
  • 06-08-07 Concrete starting to be pumped
  • 06-08-07 Concrete now flowing!
  • 06-08-07 Leveling to edge
  • 06-08-07 View from Above
  • 06-08-07 Starting to Level
  • 06-08-07 More Pouring
  • 06-08-07 Leveling
  • 06-08-07 Concrete from Truck to Pumper
  • 06-08-07 Water coming to the Surface
  • 06-08-07 Working Hard
  • 06-08-07 2/3's Complete
  • 06-08-07 End of the Boxes
  • 06-08-07 Trowel by Hand
  • 06-08-07 Power Screed in Action
  • 06-08-07 Concrete Covering the Pipes
  • 06-08-07 Almost Done
  • 06-08-07 Pouring at the Edge
  • 06-08-07 Concrete in Action
  • 06-08-07 Getting towards the End
  • 06-08-07 Progress
  • 06-08-07 Pump Truck setup
  • 06-08-07 Two Cement trucks
  • 06-08-07 At the Goal line
  • 06-08-07 Rounding the Final Corner
  • 06-08-07 Power Trowel at the Start, Finishing at the far end
  • 06-08-07 Concrete all poured
  • 06-08-07 Hand Level the last few Feet
  • 06-08-07 Power Troweling in Action
  • 06-08-07 Power Troweling is all thats left
  • 06-08-07 Dual Power Trowels

Loading…

Pouring the Rink Floor

On Friday, June 8th, 2007.. The pouring of the concrete on the Rink floor took place. The frist concrete came out of the trucks around 7:30 am and went non-stop until about 1:30 pm. The 6 hour pour used about ~230 yards of concrete in pouring the 5 inch slab. Each concrete truck holds 10 yards, so there was a bit of action at the pump truck. ** Pics Added 6-17-07 **