Creation of a new Rink Surface

Creation of a new Rink Surface

See pics of what will be hiding under and in the concrete that supports the ice surface... ** New Pics Added 6-17-07 **
https://cdn1.sportngin.com/attachments/photo/0002/8040/06-07-07_Floor_Ready_to_Pour_-_2_thumb.jpg
  • 06-07-07 Ready for Concrete
  • 06-07-07 Ready for Concrete
  • 06-07-07 Ready for Concrete
  • 06-07-07 Setting the Height of the Dashor Board Anchors
  • 06-07-07 Setting the Dasher Board Anchors
  • 06-07-07 "Greasing" the Anchors to help Locate them Later
  • 06-07-07 Setting the Dasher Board Anchors
  • 06-07-07 Setting the Dasher Board Anchors
  • 06-07-07 Rink Floor to Header Trench
  • 06-07-07 Marsh Peg Locations at Zamboni End
  • 06-07-07 Marsh Peg Locations at Locker Room End
  • 06-07-07 Return Loops at Far End of Rink
  • 06-07-07 Return Loops at Far End of Floor
  • 06-07-07 Cooling Pipes in "Chairs" and Wire Mesh
  • 06-07-07 Header Trench to Floor
  • 06-07-07 Header Trench
  • 06-07-07 Header Trench
  • Leveling 10 Inches of sand over the Warm Floor 5-22-07
  • Leveling 10 Inches of sand over the Warm Floor 5-22-07
  • Leveling 10 Inches of sand over the Warm Floor 5-22-07
  • Warm floor piping all laid out on 1 foot centers 5-20-07
  • Warm floor piping all laid out on 1 foot centers 5-20-07
  • Warm floor pipes into Header Trench 5-20-07
  • Insulation for under the Cold floor 5-20-07
  • Rebar for Cold floor 5-20-07
  • Wire Mesh for Cold floor 5-20-07
  • Warm floor headers on the ground 5-15-07
  • Working on the headers 5-15-07
  • Brackets the Header pipes sit on 5-15-07
  • Floor view 5-15-07
  • Floor view 5-15-07

Loading…

Creation of a new Rink Surface

See pics of what will be hiding under and in the concrete that supports the ice surface... ** New Pics Added 6-17-07 **