Checkout what the demolition of the building looked like starting back in March 2007
https://cdn1.sportngin.com/attachments/photo/0002/5175/4-19-07_-_Bleachers_Outside_-_2_thumb.jpg
  • Bleachers stored outside 4-19-07
  • Bleachers stored outside 4-19-07
  • Bleachers replaced by Dumpster 3-29-07
  • Bleacher walkway all gone 3-29-07
  • Bleacher walkway dismantled 3-29-07
  • Wall into old Compressor room knocked down 3-29-07
  • Upper lobby outside walls taken down 4-5-07
  • Zamboni opening enlarged for truck traffic 3-29-07
  • Taking walls apart on lower level 3-29-07
  • Upper lobby all cleared of walls 3-29-07
  • Upper lobby all cleaned 3-29-07
  • Employee + manager office ceilings 3-22-07
  • View from Rink Floor 3-22-07
  • Working in the Zamboni Garage 3-22-07
  • Trash gets tossed over the edge 3-22-07
  • Upper Lobby Demo 3-22-07
  • Scoreboards removed 3-22-07
  • Dasher facing all removed 3-22-07
  • Dasher Facing all off 3-22-07
  • Draining the Ammonia into the Sewer System 3-24-07
  • Draining the Ammonia into the Sewer System 3-24-07
  • Draining the Ammonia into the Sewer System 3-24-07
  • Exterior Shot 3-22-07
  • Exterior Shot 3-22-07
  • Exterior Shot 3-22-07
  • Steel being Constructed Jan. 2007
  • Steel being Constructed Jan. 2007
  • Steel being Constructed Jan. 2007
  • Steel being Constructed Jan. 2007
  • Steel being Constructed Jan. 2007
  • Steel being Constructed Jan. 2007
  • First Steel Erected 1-12-07