Checkout what the demolition of the building looked like starting back in March 2007
http://assets.ngin.com/attachments/photo/0002/5295/01-12-07_First_Steel_thumb.jpg
First Steel Erected 1-12-07
Steel being Constructed Jan. 2007
Steel being Constructed Jan. 2007
Steel being Constructed Jan. 2007
Steel being Constructed Jan. 2007
Steel being Constructed Jan. 2007
Steel being Constructed Jan. 2007
Exterior Shot 3-22-07
Exterior Shot 3-22-07
Exterior Shot 3-22-07
Draining the Ammonia into the Sewer System 3-24-07
Draining the Ammonia into the Sewer System 3-24-07
Draining the Ammonia into the Sewer System 3-24-07
Dasher Facing all off 3-22-07
Dasher facing all removed 3-22-07
Scoreboards removed 3-22-07
Upper Lobby Demo 3-22-07
Trash gets tossed over the edge 3-22-07
Working in the Zamboni Garage 3-22-07
View from Rink Floor 3-22-07
Employee + manager office ceilings 3-22-07
Upper lobby all cleaned 3-29-07
Upper lobby all cleared of walls 3-29-07
Taking walls apart on lower level 3-29-07
Zamboni opening enlarged for truck traffic 3-29-07
Upper lobby outside walls taken down 4-5-07
Wall into old Compressor room knocked down 3-29-07
Bleacher walkway dismantled 3-29-07
Bleacher walkway all gone 3-29-07
Bleachers replaced by Dumpster 3-29-07
Bleachers stored outside 4-19-07
Bleachers stored outside 4-19-07
Loading…
Share this Photo
(
0
) View Cart
Add to Cart
Demo Pics
Checkout what the demolition of the building looked like starting back in March 2007
©2012 Essex Vermont Youth Hockey /
SPORT NGIN
. All Rights Reserved.
Terms of Use
Privacy Policy
Help